Type | Seamless carbon steel pipe | |
Materials | Q235B, 20#, Q345B A53B, A106B, API 5L B, X42, X46, X52, X60, X65 ST37.0, ST35.8, St37.2, St35.4/8, St42, St45, St52, St52.4 STP G38, STP G42, STPT42, STB42, STS42, STPT49, STS49 | |
Size | Outer Diameter | Seamless:17-914mm 3/8"-36" |
Wall Thickness | SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80 SCH100 SCH120 SCH140 SCH160 XXS | |
Length | Single random length/Double random length 5m-14m, 5.8m, 6m, 10m-12m, 12m or as customer's actual request | |
Ends | Plain end/Beveled, protected by plastic caps on both ends, cut quare, grooved, threaded and coupling, etc. | |
Surface Treatment | Bare, Painting black, varnished, galvanized, anti-corrosion 3PE PP/EP/FBE coating | |
Technical Methods | Hot-rolled | |
Third party inspection | SGS/BV as per required | |
Main market | Asia, India, Middle East, America, Europe | |
Testing Methods | Pressure test, Flaw detection, Eddy current testing, Hydro static testing or Ultrasonic examination and also with chemical and physical property inspection | |
Packaging | Small pipes in bundles with strong steel strips, large pieces in loose; Covered with plastic woven bags; Wooden cases; Suitable for lifting operation; Loaded in 20ft 40ft or 45ft container or in bulk; Also according to customer's requests | |
Origin | China | |
Application | Conveying oil gas and water | |
Third Party Inspection | SGS BV MTC | |
Trade Terms | FOB CIF CFR | |
Payment Terms | FOB 30%T/T, 70% before shipment CIF 30% pre-payment and the balance to be paid before making shipment or Irrevocable 100% L/C at sight | |
MOQ | 5 tons | |
Supply Capacity | 8000 T/M | |
Delivery Time | Usually within 10-45 days after receipt of advance payment |
hot rolled seamless steel pipe
Looking for quality hot rolled seamless steel pipes? Look no further! As a factory, we provide reliable and durable products that meet your needs.
Request a QuotePRODUCTS DETAILS
Hot Products
Contact us
Please feel free to give your inquiry in the form below We will reply you in 24 hours